Skip to product information
1 of 1

Tech Lighting

Tech Lighting MonoRail Pre Bent S Curve

Tech Lighting MonoRail Pre Bent S Curve

Regular price $237.00
Regular price $286.00 Sale price $237.00
Sale Sold out

Tech Lighting MonoRail Pre-Bent S Curve

MonoRail pre-bent into a horizontal S curve. Each piece of rail is shipped with conductive connectors to join rail pieces end to end. Order additional connectors if cutting and rejoining rails. Rated for 300W at 12V, 600W at 24V.

Color
BR: Brown*
Clear

*Brown color available only with Antique Bronze finish.

Finish
Z: Antique Bronze
C: Chrome
S: Satin Nickel

Dimension
0.6" H x 0.3" W x 92" L

Shipping
If in stock, item ships in 3 to 7 business days.

Certification
ETL Listed

Item Code
700MOBHSC60

Shipping & Returns

Free Shipping within the U.S. for orders over $100.

All products on our website are final sale and non-returnable.

What are the items you could return?
1. Items received damaged or broken
2. Incorrect items that were shipped
3. Defective items

A replacement will be shipped right away.

View full details
Pablo Designs Swell Pendant LED Lighting System

Swell: Modular LED

Pablo Designs Swell is a modular LED lighting system designed to seamlessly blend the line between indoor and outdoor lighting. Swell’s 3 shade designs pair fluid, undulating lines with a radiant brass interior and can be mixed and matched to create dynamic groupings.

Learn more

  • Free Shipping

    Free Shipping within the 48 continental United States for orders over $100. Free Shipping is only for Ground via FedEx, UPS, USPS, or Curbside Delivery for large/heavy items.

    Learn more 
  • Return Policy

    Our return policy is based on the manufacturer. Please inspect the items delivered to you before accepting them. A replacement will be shipped for incorrect, defective or damaged item.

    Learn more